    1500HP Drilling Rig Solids Control System To CNPC-CCDE

    CNPC Chuanqing Drilling Engineering Company Limited is a subsidiary company of CNPC ,which is China's largest oil and gas producer and supplier, as well as one of the world's major oilfield service providers and a globally reputed contractor in engineering construction, with businesses covering petroleum exploration & production, natural gas & pipelines, refining & marketing, oilfield services, engineering construction, petroleum equipment manufacturing and new energy development, as well as capital management, finance and insurance services.

    This is the 10th batch drilling rig complete solid control system manufactured by FD Petrol for CCDE 1500 hp drilling rig,which including four phase solids control system and mixing system

    1.6 units 12 meters long mud tanks 

    2.Triple FDZS 255I shale shakers,which avaerage shaker screen life is 20 days ,sometimes can reach 30 days.

    Triple Shale Shaker  Decanter Centrifuge for CCDE

    3.One unit FDQJ 2S12N high effiency mud cleaners with PU desander & desilter cones

    4.One unit vacuum degasser

    5.FD450-842 Middle speed decanter centrifuge

    6.FDLW 355-1250N high speed decanter centrifuge

    1500hp solids control system Mud Tanks

    7.Twin jet mud mixer with 75 kw mixing pump for mud mixing 

    8.15 units 15kw mud agitators and 1 unit 7.5kw mud agitator for pile tank

    FD Petrol well organized solids control company just need one month to finish the complete system,we believe every fast delivery exist for a reason ,all of the solids control equipment are supplied from stock ,every month we make stock for 20 units decanter centrifuges ,while sometime they are still not engough.FD Petrol always look for providing our customers with high standard  and short leadtime solids control system.


    FD Petrol Drilling Waste Management & Solids Control & Rig Camp